Projects

A selection of eight completed steel projects, 2014–2026, delivered by our team across Ajyal Group. Most recent first. Client names and contract values are not published; references and a full project list are available on request.

Completed projects, most recent first
CompletedProjectLocationScopeContract
2026 Steel Main Gates and Government Building Basra, Iraq Seven port gates and a 2,800m² building Supply and build
2023 Galvanised Modular Truss Bridge over Mangrove Channel Abu Dhabi 250m bridge over water Supply and build
2022 Arched Pedestrian Bridges Sharjah Four 45m truss bridges Design and build
2021 Pedestrian Bridge with CNC Decoration Umm Al Quwain 60m span, laser-cut cladding Design and build
2020 Quarry Steel Conveyor Structures Fujairah Two 80m conveyor galleries Design and build
2018 Pedestrian Bridge with Aluminium Cladding Ras Al Khaimah 65m span, lift access Design and build
2016 Urban Design Pedestrian Bridge Ajman 40m span, lift access Design and build
2014 School Link Pedestrian Bridge Ras Al Khaimah 22m enclosed link bridge Design and build

Steel Main Gates and Government Building

Basra, Iraq. Completed 2026. Supply and build.

Seven steel-structure port entry and exit main gates, each delivered with its full MEP and finishing package, together with a 2,800m² steel-structure government building for port employees including MEP and interior works. Supply-and-build scope: fabrication in the UAE, export to Iraq, and erection, fit-out and handover on site.

Gates
7 port entry and exit
Building
2,800m² steel frame, MEP and interiors
Delivery
Fabricated in the UAE, exported by road and sea
Yellow steel truss port entry gate gantry erected across the port road under a clear sky, Basra.
Port entry gate under construction, exposed steel frame, Basra.

Galvanised Modular Truss Bridge over Mangrove Channel

Abu Dhabi, UAE. Completed 2023. Supply and build.

A 250m private bridge over water, built from galvanised modular steel truss panels spanning between piled concrete piers. Supply-and-build scope: the modular spans were assembled onshore, then lifted and placed onto the piers by barge-mounted crawler crane working from the channel.

Length
250m multi-span
Finish
Hot-dip galvanised
Erection
Barge-mounted crawler crane
Barge-mounted crawler crane lifting a galvanised modular steel truss span onto piled concrete piers over a mangrove channel.
Modular span lifted onto piled piers from the channel.

Arched Pedestrian Bridges

Sharjah, UAE. Completed 2022. Design and build.

Four steel truss pedestrian bridges, each spanning 45m, with decorative arch superstructures, glass balustrades and steel access ramps. A full design-and-build contract covering structural design, fabrication and coating at the Ras Al Khaimah facility, and night-time erection of the spans over live carriageways using mobile cranes.

Span
45m four bridges
Structure
Steel truss with decorative arches
Erection
Night lifts over live carriageways, mobile crane
Steel truss pedestrian bridge with decorative arches and glass balustrades crossing a road in Sharjah at sunset.
Completed bridge, glass balustrades and ramp access.

Pedestrian Bridge with CNC Decoration

Umm Al Quwain, UAE. Completed 2021. Design and build.

A 60m span steel truss pedestrian bridge with lift access. The truss is wrapped in CNC laser-cut steel cladding that forms a continuous decorative screen along the length of the deck. Full design-and-build scope, from concept and structural design through fabrication, coating and erection to handover.

Span
60m
Access
Lift and stairs
Envelope
CNC laser-cut steel screen
Steel truss pedestrian bridge wrapped in a CNC laser-cut steel screen running the length of the deck, Umm Al Quwain.
Full length of the deck showing the laser-cut screen.

Quarry Steel Conveyor Structures

Fujairah, UAE. Completed 2020. Design and build.

Two 80m span steel conveyor support structures for a quarry operation in the Fujairah mountains, fabricated from built-up heavy sections with walkways, handrails and lighting supports. Design-and-build scope covering structural design, fabrication, coating and erection of the elevated galleries with mobile cranes on an operating quarry site.

Span
80m two structures
Sections
Built-up heavy plate
Site
Operating quarry, mobile cranes
Elevated steel conveyor support gallery on tubular columns with walkways and handrails at a quarry, Fujairah.
Elevated conveyor gallery on tubular columns, quarry floor.

Pedestrian Bridge with Aluminium Cladding

Ras Al Khaimah, UAE. Completed 2018. Design and build.

A 65m span steel truss pedestrian bridge with lift access, the longest single-structure road crossing in this portfolio. The walkway is enclosed along its full length in decorative cladding of aluminium hollow sections. Delivered as a full design-and-build contract covering design, fabrication, coating, lift installation and erection.

Span
65m single structure
Access
Lift tower and stairs
Envelope
Aluminium hollow-section cladding
Interior of an enclosed pedestrian walkway clad in aluminium hollow sections, looking along the deck.
Walkway interior, aluminium hollow-section envelope.

Urban Design Pedestrian Bridge

Ajman, UAE. Completed 2016. Design and build.

A 40m span steel truss pedestrian bridge with lift access, designed to a contemporary urban brief for a city road in Ajman. Full design-and-build scope covering structural design, fabrication and coating at the Ras Al Khaimah facility, lift installation, erection over the live road and handover.

Span
40m
Access
Lift and stairs
Erection
Over live road
Design
In-house structural design and shop drawings
Fabrication
Ras Al Khaimah Free Zone facility
Coating
Blast clean, primer, epoxy, topcoat
Handover
Lift installation, erection, documentation

School Link Pedestrian Bridge

Ras Al Khaimah, UAE. Completed 2014. Design and build.

A 22m span steel truss link bridge connecting two school buildings at upper-floor level. The walkway is fully enclosed and air-conditioned, with floor-to-ceiling glazing and aluminium composite panel finishes. Design-and-build delivery, with the span lifted into place between the existing buildings at night.

Span
22m between buildings
Walkway
Enclosed, air-conditioned, floor-to-ceiling glazing
Erection
Night lift between existing buildings
Enclosed steel link bridge spanning between two school buildings at upper-floor level, Ras Al Khaimah.
Enclosed link bridge between the two school buildings.